The Complete Guide to Safe Asbestos Removal: Protecting Your Family from Hidden Home Hazards

In The Community

Executive Summary

When dangerous asbestos materials threaten your home environment, only certified specialists can safely eliminate these cancer-causing fibers using advanced containment systems and EPA-approved methods. Professional asbestos abatement involves comprehensive testing, strategic risk evaluation, secure containment protocols, expert removal techniques, continuous air quality monitoring, and compliant waste disposal procedures.

Professional Asbestos Cleaning in Fort Wayne Indiana

Investment ranges typically span $1,200 to $15,000+ based on project complexity and regional compliance standards. Self-directed removal attempts create severe health dangers and legal infractions. Licensed contractors guarantee safety compliance, regulatory adherence, and protection against lethal fiber exposure linked to mesothelioma, pulmonary cancer, and respiratory scarring diseases.

A Cautionary Tale: When Home Improvement Becomes Health Crisis

Several years back, homeowner Grace embarked on updating her 1960s residence. While working in her basement, she discovered deteriorating, powdery substance falling from aged pipe wrapping. Treating it as ordinary debris, she used a standard broom to clear the material and resumed her renovation activities.

Several weeks afterward, Grace experienced persistent respiratory symptoms—chronic coughing and breathing difficulties that intensified over time. Concerned about her declining health, she consulted her physician, who immediately inquired about potential asbestos contact. This marked Grace’s first awareness of the hazardous material she had unknowingly handled.

Her doctor emphasized how even minimal asbestos fiber exposure could trigger serious medical conditions years or decades in the future. Grace now requires routine chest imaging and lung capacity evaluations to track her respiratory wellness. The psychological burden of uncertainty about future disease development became overwhelming. What started as an exciting home renovation transformed into a source of perpetual worry and medical monitoring.

Grace’s experience demonstrates asbestos’s primary challenge: these materials appear innocent to untrained individuals while posing extreme dangers when handled improperly. Her hard-learned wisdom proved clear—suspected asbestos materials demand professional intervention, not homeowner attempts. Safe removal requires trained specialists who comprehend hazard levels, follow regulatory protocols, and employ appropriate protective equipment for both workers and building residents.

Understanding Asbestos: The Invisible Threat in Your Home

Asbestos represents a collection of six naturally-formed mineral fibers utilized extensively in building construction during the 1900s due to their remarkable heat resistance, fire protection, chemical stability, and electrical insulation properties. These mineral varieties encompass chrysotile (white variety), amosite (brown type), crocidolite (blue form), tremolite, anthophyllite, and actinolite. Residential construction predominantly featured chrysotile, comprising approximately 95% of building-related asbestos applications.

The hazard originates from microscopic asbestos particles released when containing materials suffer damage, disturbance, or natural deterioration. These particles measure extremely small dimensions—roughly 700 times finer than human hair—and maintain airborne suspension for extended periods, potentially hours or days. Upon inhalation, these minute fibers embed permanently within lung tissue and other organs, where bodily systems cannot decompose or eliminate them.

Accumulated fiber deposits eventually trigger severe medical conditions including:

Asbestosis: Progressive lung tissue scarring creating increasingly severe breathing impairment. This condition generally develops following extended exposure periods and may progress to complete respiratory system failure.

Pulmonary Cancer: Research demonstrates asbestos contact substantially elevates lung cancer probability, particularly among tobacco users. Combined smoking and asbestos exposure creates multiplicative cancer risk factors.

Mesothelioma: An uncommon yet aggressive malignancy affecting protective tissue layers surrounding lungs, abdomen, or cardiac regions. This disease maintains almost exclusive connection to asbestos exposure and carries extremely poor survival outcomes.

Pleural Conditions: Encompassing tissue plaques, fluid accumulation, and membrane thickening, producing chest discomfort and respiratory complications.

Since asbestos-related disease symptoms typically emerge 20 to 50 years following initial contact, exposure represents a “delayed health crisis.” This extended development timeline means current exposure may not manifest symptoms until decades later, emphasizing prevention through proper material handling as absolutely essential.

Identifying Asbestos Locations Throughout Your Property

Property owners frequently inquire: “How can I determine whether my residence contains asbestos materials?” The response depends significantly on construction timing and material selections. Asbestos found widespread application in building products from early 1900s through late 1980s, with maximum utilization occurring during 1930-1980.

Typical residential asbestos locations encompass:

Thermal Insulation Systems:

  • Piping and heating equipment insulation within older basements and utility areas
  • Vermiculite attic insulation products, particularly Zonolite manufacturing
  • Interior wall and ceiling insulation in pre-1980 construction

Floor Covering Materials:

  • Vinyl tiles and sheet products manufactured prior to 1980
  • Installation adhesives and bonding compounds for flooring applications
  • Linoleum product backing materials

External Building Components:

  • Asbestos-cement roofing tile products
  • Corrugated asbestos-cement exterior siding panels
  • Roofing membrane and weatherproofing materials

Interior Construction Elements:

  • Ceiling panels and suspended grid systems
  • Textured coatings and repair compounds utilized before 1980
  • Sound-dampening plaster and ornamental ceiling applications
  • Wall panels and joint sealing compounds

Climate Control Systems:

  • Heating duct insulation and connection components
  • Heating unit insulation and heat transfer elements
  • Sealing materials and packing components in climate systems

Additional Common Applications:

  • Cement panels for interior walls and ceilings
  • Weatherproofing materials around openings and joints
  • Fire-protection storage units and office equipment
  • Selected household appliances manufactured before 1980

Properties constructed before 1980 carry substantial probability of containing asbestos materials. Residences built during 1980-1990 may also include certain asbestos products due to gradual elimination processes.

The Dangerous Reality of DIY Asbestos Attempts

Professional Asbestos Cleaning in Fort Wayne Indiana

Homeowners commonly question: “Can I handle asbestos removal personally to reduce expenses?” The response remains definitively negative, and here’s why self-directed asbestos handling proves hazardous and frequently unlawful:

Medical Dangers:

  • Disturbing asbestos releases invisible microscopic particles that cannot be detected through sight, smell, or taste
  • These particles remain airborne for extended periods and distribute throughout residential spaces
  • Even minimal exposure may potentially trigger health complications decades afterward
  • Household members, pets, and neighboring residents face exposure risks

Equipment Inadequacy:

  • Standard household cleaning equipment cannot capture asbestos particles; they frequently worsen contamination by spreading fibers through exhaust systems
  • Conventional cleaning implements like brooms and mops agitate particles rather than containing them
  • Appropriate removal demands specialized HEPA-filtered machinery and negative pressure containment systems

Legal Complications:

  • Multiple jurisdictions prohibit unlicensed individuals from attempting asbestos removal
  • Inappropriate disposal methods may trigger substantial environmental agency penalties
  • Property insurance policies may exclude coverage for damages resulting from improper asbestos management
  • Property owners may face liability for exposing others to hazardous fibers

Economic Ramifications:

  • Self-directed attempts frequently generate higher long-term costs due to contaminated areas requiring extensive professional remediation
  • Inappropriate handling may spread asbestos throughout residential properties, multiplying cleanup expenses
  • Property valuations may suffer negative impact from improperly disturbed asbestos
  • Potential legal responsibility for exposing family members or service workers

Disposal Mandates:

  • Asbestos waste requires placement in specifically labeled, sealed containers
  • Transportation demands licensed carriers with appropriate permits
  • Disposal must occur at authorized facilities with specialized asbestos processing capabilities
  • Inappropriate disposal may result in criminal prosecution in certain jurisdictions

Professional Asbestos Removal: The Eight-Stage Process

Professional Asbestos Cleaning in Fort Wayne Indiana

Licensed asbestos contractors implement carefully controlled procedures designed to safeguard workers and building occupants. Here are the comprehensive stages involved:

Stage 1: Thorough Property Evaluation and Material Testing

Certified asbestos inspectors perform detailed property assessments, identifying suspected asbestos-containing materials. They gather samples using appropriate methods to prevent fiber release, including:

  • Pre-wetting materials before sampling to minimize particle release
  • Utilizing specialized instruments to collect representative samples
  • Securing samples within sealed, leak-proof containers
  • Submitting samples to accredited laboratories for polarized light microscopy (PLM) or transmission electron microscopy (TEM) evaluation

Laboratory analysis delivers definitive asbestos identification and percentage concentration within each tested material.

Stage 2: Complete Hazard Risk Evaluation

Upon asbestos confirmation, certified professionals evaluate multiple considerations:

  • Current condition of asbestos-containing materials (undamaged versus deteriorated)
  • Potential for particle release during routine building activities
  • Material location and accessibility factors
  • Planned renovation or construction activities
  • Building occupancy and usage patterns

Based on this evaluation, professionals determine whether materials require removal, encapsulation, or undisturbed monitoring with regular assessment.

Stage 3: Work Zone Preparation and Isolation

Before beginning any work, areas must receive proper preparation:

  • Removal of all portable items from designated work zones
  • HVAC system shutdown and sealing to prevent particle distribution
  • Installation of plastic barrier systems (6-mil thickness polyethylene)
  • Construction of decontamination stations including clean areas, washing facilities, and equipment zones
  • Deployment of negative air pressure systems with HEPA filtration to establish airflow into work areas
  • Installation of critical barrier systems at all access points

Stage 4: Worker Safety and Protection Protocols

All personnel must receive appropriate training and equipment:

  • Completion of EPA-approved asbestos worker education programs
  • Utilization of disposable protective clothing, hand protection, and footwear covers
  • Appropriate respiratory protection using NIOSH-approved breathing apparatus
  • Implementation of decontamination protocols for work area entry and exit
  • Medical monitoring programs for worker health assessment

Stage 5: Specialized Removal and Treatment Approaches

Actual cleaning or removal procedures vary based on material characteristics:

Wet Removal Techniques: Materials receive saturation with amended water solutions (containing surfactants) to prevent particle release during removal processes.

Encapsulation Methods: Undamaged materials may receive sealing with specially formulated encapsulants that bind fibers and prevent release.

Glove Bag Applications: Limited quantities of asbestos insulation may be removed using sealed containment bags for minimal disturbance.

Complete Containment Removal: Extensive projects require full containment with negative air pressure and comprehensive worker protection.

Stage 6: Continuous Air Quality Monitoring

Throughout project duration, certified industrial hygienists perform air monitoring:

  • Individual worker sampling to verify respiratory protection effectiveness
  • Work area sampling within containment zones to monitor work practices
  • Perimeter air sampling outside containment to confirm no particle escape
  • Real-time monitoring using phase contrast microscopy for immediate results

Stage 7: Waste Collection and Disposal

All asbestos waste must receive handling according to strict protocols:

  • Double-bagging in 6-mil polyethylene containers with appropriate warning labels
  • Placement in rigid, leak-tight containers for transportation
  • Documentation with custody tracking records
  • Transportation by licensed carriers to EPA-approved disposal locations
  • Disposal in specially designated sections of approved landfills

Stage 8: Final Cleaning and Clearance Verification

The completion process includes multiple confirmation steps:

  • HEPA vacuuming of all containment area surfaces
  • Wet cleaning and surface preparation of all areas
  • Visual inspection by certified inspectors for remaining debris
  • Aggressive air sampling using air circulation devices to disturb potentially remaining particles
  • Laboratory analysis of clearance air samples
  • Comparison of results to regulatory clearance standards (typically 0.01 fibers per cubic centimeter)

Only following successful clearance testing may containment barriers be removed and areas reoccupied.

Professional Asbestos Removal Investment Guide

Property owners regularly search for: “What does asbestos removal cost?” The answer depends on various factors affecting both complexity and duration:

Cost-Influencing Factors

Project Size and Complexity:

  • Limited projects (individual pipe insulation): $500 – $1,500
  • Moderate projects (basement ceiling systems): $2,000 – $5,000
  • Extensive projects (complete house siding): $10,000 – $30,000+
  • Commercial properties: $50,000 – $500,000+

Material Type Classification:

  • Friable asbestos (easily damaged): Higher costs due to enhanced containment requirements
  • Non-friable asbestos: Lower costs but still requires careful handling
  • Asbestos percentage in materials affects disposal expenses

Location and Access Considerations:

  • Restricted spaces like crawl areas or attics increase project costs
  • Multi-level buildings require additional safety equipment
  • Urban locations may have elevated labor and disposal costs

Geographic Differences:

  • Labor costs fluctuate significantly by location
  • Local regulations may mandate additional procedures
  • Disposal facility availability affects transportation expenses

Supplementary Services:

  • Pre-demolition evaluations: $300 – $800
  • Air monitoring during operations: $300 – $500 daily
  • Post-removal clearance testing: $400 – $1,200
  • Emergency response services: 25-50% premium above standard pricing

Comprehensive Cost Analysis

Professional Inspection and Testing: $300 – $800 This initial phase proves essential for determining presence and extent of asbestos-containing materials.

Limited Residential Projects (under 100 square feet): $1,200 – $3,000 Typical projects encompass pipe insulation removal or small ceiling tile areas.

Moderate Residential Projects (100-500 square feet): $3,000 – $8,000 Common projects include basement ceiling systems or partial flooring removal.

Extensive Residential Projects (over 500 square feet): $8,000 – $25,000 Comprehensive projects like complete house siding removal or total insulation abatement.

Additional Investment Considerations:

  • Temporary housing during extensive projects: $100-200 nightly
  • Property damage repairs following abatement: Variable costs
  • Insurance premium increases: Varies by provider
  • Lost work time during project duration: Personal consideration

Cost Management Strategies

While asbestos abatement represents significant expense, legitimate cost management approaches include:

Multiple Quote Comparison: Prices may vary considerably between contractors, but always verify licensing and insurance coverage.

Strategic Timing: Some contractors provide reduced rates during slower business periods.

Project Bundling: Combining asbestos removal with additional renovation work may reduce overall expenses.

Partial Abatement: In certain situations, encapsulation or leaving undisturbed materials in place may prove acceptable and cost-effective.

Regulatory Framework Governing Asbestos Operations

A commonly asked question involves: “Which agencies establish asbestos cleanup regulations?” The regulatory structure for asbestos abatement proves complex, involving multiple agencies across federal, state, and local jurisdictions:

Federal Regulatory Structure

Environmental Protection Agency (EPA):

  • National Emission Standards for Hazardous Air Pollutants (NESHAP) under Clean Air Act
  • Toxic Substances Control Act (TSCA) regulations for educational and public buildings
  • Asbestos Hazard Emergency Response Act (AHERA) for educational facilities
  • Worker Protection Rule for contractors

Occupational Safety and Health Administration (OSHA):

  • Construction Standard (29 CFR 1926.1101) for renovation and demolition activities
  • General Industry Standard (29 CFR 1910.1001) for building operations
  • Respiratory protection standards and medical surveillance requirements

Department of Transportation (DOT):

  • Hazardous materials transportation regulations for asbestos waste
  • Packaging, labeling, and shipping requirements

State and Local Regulatory Requirements

Many states maintain additional requirements potentially more restrictive than federal standards:

Licensing Requirements:

  • Contractor licensing and certification programs
  • Worker training and certification requirements
  • Inspector and project designer licensing

Notification Requirements:

  • Advance notification to state agencies before work commencement
  • Project registration and permit requirements
  • Waste shipment tracking and manifests

Enhanced Standards:

  • More restrictive clearance levels for air testing
  • Improved worker protection requirements
  • Stricter disposal facility regulations

Compliance and Penalty Structure

Failure to comply with asbestos regulations may result in severe penalties:

Civil Penalties:

  • EPA violations: Up to $37,500 daily per violation
  • OSHA violations: Up to $13,653 per serious violation
  • State penalties: Vary by jurisdiction but may be substantial

Criminal Penalties:

  • Knowing violations may result in federal criminal charges
  • Fines up to $250,000 for individuals and $500,000 for organizations
  • Imprisonment up to 15 years for serious violations

Additional Consequences:

  • License suspension or revocation
  • Project stop-work orders
  • Required re-abatement at violator’s expense
  • Civil liability for exposure damages

Health Advantages of Professional Asbestos Removal

When asbestos receives safe removal by qualified professionals, property owners and building occupants gain numerous health and financial advantages:

Immediate Health Improvements

Enhanced Indoor Air Quality: Professional abatement eliminates asbestos fiber release sources, creating cleaner, safer indoor environments for all occupants.

Minimized Exposure Risk: Proper removal eliminates ongoing risks of fiber release from damaged or deteriorating materials.

Safe Renovation Environment: Professional removal allows future renovation activities to proceed without risks of disturbing asbestos materials.

Long-term Health Protection

Disease Prevention: Eliminating asbestos exposure significantly reduces risks of developing asbestos-related diseases decades later.

Family Protection: Professional removal protects all household members, including children who may demonstrate greater susceptibility to fiber exposure.

Visitor Safety: Guests, service personnel, and contractors receive protection from potential exposure.

Financial and Property Advantages

Enhanced Property Value: Asbestos-free homes prove more attractive to buyers and may command higher sale prices.

Reduced Insurance Liability: Proper abatement may reduce liability concerns and potentially lower insurance premiums.

Renovation Freedom: Once asbestos receives proper removal, property owners may undertake renovations without expensive specialized procedures.

Peace of Mind: Knowing hazardous materials have received safe removal provides invaluable psychological benefits.

Project Duration Expectations

Another voice search-friendly inquiry involves: “How long does asbestos removal require?” Duration depends on multiple factors related to project complexity:

Project Timeline Factors

Limited Projects (1-3 days total):

  • Individual pipe insulation removal: 4-8 hours active work
  • Small ceiling tile area: 1-2 days including setup and clearance
  • Glove bag removals: 2-4 hours per location

Moderate Projects (1-2 weeks total):

  • Basement ceiling systems: 3-5 days active work
  • Partial flooring removal: 4-7 days depending on square footage
  • Multiple small areas: 1-2 weeks with mobilization between areas

Extensive Projects (2-8 weeks total):

  • Complete house siding removal: 2-4 weeks depending on size
  • Complete building abatement: 4-8 weeks for extensive projects
  • Complex industrial removals: Several months for large facilities

Timeline Components

Pre-Work Phase (3-10 days):

  • Permit applications and approvals
  • Material ordering and site preparation
  • Worker scheduling and equipment mobilization
  • Final project planning and safety briefings

Active Work Phase (Variable):

  • Containment setup: 0.5-2 days depending on size
  • Material removal or treatment: 1-30+ days depending on scope
  • Daily cleanup and waste packaging: Ongoing throughout project

Post-Work Phase (2-5 days):

  • Final cleaning and surface preparation
  • Clearance air sampling: 24-48 hours for laboratory results
  • Containment removal and area restoration
  • Final inspection and documentation

Timeline Extension Factors

Weather Conditions: Outdoor work may face weather delays, and humidity may affect clearance testing.

Discovery of Additional Materials: Finding unexpected asbestos during work requires project modifications.

Failed Clearance Tests: If initial air samples don’t meet standards, additional cleaning and re-testing becomes necessary.

Regulatory Delays: Permit issues or inspection scheduling may cause delays.

Site Complications: Structural issues, utility conflicts, or access problems may slow progress.

Homeowner Response Plan for Suspected Asbestos

Here’s a comprehensive step-by-step guide for property owners who suspect asbestos in their homes:

Immediate Response Actions

Step 1: Cease All Disturbance Activities

  • Do not touch, move, or disturb suspected materials
  • Keep people and pets away from the area
  • Avoid cleaning the area with vacuums or brooms
  • Do not attempt to collect samples yourself

Step 2: Document Current Conditions

  • Take photographs from safe distances without disturbing materials
  • Note location, size, and condition of suspected materials
  • Record any recent activities that may have disturbed materials
  • Document any symptoms or concerns among occupants

Professional Assessment Phase

Step 3: Contact Qualified Professionals

  • Hire certified asbestos inspectors (independent of abatement contractors)
  • Verify inspector licensing and insurance coverage
  • Request references and check previous work quality
  • Ensure inspectors use accredited laboratories

Step 4: Professional Inspection Process

  • Allow inspector access to all areas of concern
  • Discuss renovation plans and timeline needs
  • Review inspection reports and laboratory results thoroughly
  • Get recommendations for next steps in writing

Professional Asbestos Services in Indianapolis

Need Expert Asbestos Removal in Indianapolis? Contact PuroClean Disaster Restoration at (317) 467-4436 for certified, safe asbestos cleanup and removal services.

With nearly two decades of experience in hazardous material remediation and property restoration, our licensed specialists have assisted countless Indianapolis property owners and businesses in eliminating asbestos dangers while maintaining health and safety standards.

We take pride in our 100+ five-star Google reviews, demonstrating our commitment to professionalism, safety compliance, and customer satisfaction.

Review our verified customer testimonials and discover why Indianapolis residents trust PuroClean for professional asbestos removal services.

Decision-Making Process

Step 5: Evaluate Results and Response Options

If Testing Shows No Asbestos:

  • Maintain documentation for future reference
  • Proceed with renovation plans as desired
  • Consider periodic re-evaluation for other suspected materials

If Asbestos Present but Undamaged:

  • Consider leaving materials undisturbed with periodic monitoring
  • Evaluate encapsulation options if disturbance planned
  • Plan professional removal before any renovation

If Asbestos Present and Damaged:

  • Isolate area from regular use
  • Contact certified abatement contractors immediately
  • Obtain multiple quotes for removal work
  • Plan temporary relocation if necessary

Contractor Selection Process

Step 6: Choose Qualified Abatement Contractors

  • Verify all required licenses and certifications
  • Check insurance coverage including liability and workers’ compensation
  • Review previous project references and complaint records
  • Compare detailed written proposals including all costs
  • Ensure contractors follow all regulatory requirements

Project Oversight

Step 7: Monitor the Abatement Process

  • Verify all permits obtained before work begins
  • Ensure proper containment and safety procedures followed
  • Stay informed about project progress and complications
  • Review all clearance testing results before reoccupancy

Frequently Asked Questions About Asbestos Removal

Q1. Does asbestos always pose immediate danger?

Asbestos presents greatest danger when disturbed and fibers become airborne. Undamaged materials that remain intact may pose minimal immediate risk but still require regular monitoring. However, any asbestos-containing material possesses potential to release fibers if damaged, making professional evaluation always advisable.

Q2. Can homes be completely cleared of asbestos materials?

Yes, asbestos materials may be safely and completely removed from residences through proper professional abatement procedures. However, removal isn’t always necessary – sometimes encapsulation or leaving undamaged materials in place with regular monitoring may represent the most appropriate approach.

Q3. What occurs if someone inhales asbestos dust once?

While single exposure carries less risk than chronic exposure, no established “safe” level of asbestos inhalation exists. Even brief exposure may potentially cause health problems decades later, though risk increases with amount and duration of exposure. Anyone suspecting exposure should inform their healthcare provider and discuss appropriate monitoring.

Q4. Do regulations require asbestos inspections before home sales?

Requirements vary by location, but many regions require asbestos inspections before sale, especially for homes built before 1980. Even where not legally required, inspections often receive recommendation to avoid future liability and provide peace of mind to buyers.

Q5. Can consumer air purifiers remove asbestos fibers?

Standard consumer air purifiers prove ineffective at removing asbestos fibers. Only specialized HEPA filtration systems used during professional cleanup can effectively capture these microscopic fibers. Standard air purifiers may actually spread fibers around rather than removing them.

Q6. How can materials be identified as containing asbestos without professional testing?

Visual determination of asbestos content proves impossible. Many asbestos-containing materials appear identical to asbestos-free alternatives. Only laboratory analysis using polarized light microscopy or electron microscopy can definitively identify asbestos presence.

Q7. What actions should be taken if asbestos gets accidentally disturbed?

If you suspect disturbing asbestos materials, immediately stop the activity and leave the area. Avoid creating air currents that could spread fibers. Contact an asbestos professional for assessment and possible cleanup. Consider consulting with a healthcare provider about the exposure.

Q8. Does encapsulation provide equal effectiveness to removal?

Encapsulation may prove very effective for materials in good condition that won’t face future disturbance. It’s often less expensive and disruptive than removal. However, encapsulation requires ongoing monitoring and may need periodic renewal. Removal receives general preference before major renovations.

Final Thoughts: Safeguarding Your Family’s Future

Grace’s cautionary experience serves as a compelling reminder that asbestos materials should never be underestimated or handled carelessly. While these materials may appear harmless to untrained individuals, disturbing them without proper protection and expertise may have serious lifelong consequences for both immediate health and long-term well-being.

The complexity of asbestos abatement – from initial inspection through final clearance testing – demonstrates why this work must remain with trained, licensed professionals. The regulatory framework exists to protect both workers and building occupants, and the specialized equipment and procedures have been developed through decades of research and experience.

For property owners facing potential asbestos issues, the investment in professional services extends beyond regulatory compliance – it involves protecting family health and safety, maintaining property values, and ensuring peace of mind. The cost of professional abatement, while significant, pales compared to potential health care costs and legal liabilities associated with improper handling.

If you suspect asbestos in your property, remember Grace’s lesson: the safest and most responsible path always involves seeking professional help. Contact certified inspectors and abatement contractors who possess the training, equipment, and experience to handle these hazardous materials safely. Your health, your family’s well-being, and your property’s value all depend on making the right choice regarding asbestos management.